Inventory and MRO glossary

Short definitions of inventory planning and MRO terms, each linking to the full topic where there is one.

A

ABC analysis
Classifying items by annual consumption value.
Average demand interval (ADI)
The average number of periods between demands. Used to classify demand patterns.

B

Bill of materials (BOM)
The list of parts that make up a piece of equipment. Links spares to the equipment they support.

C

Core
A removed, usually defective, unit returned for repair or exchange.
Criticality
How severe the consequence is if equipment fails or a part is unavailable.
Croston’s method
A forecasting method for intermittent demand that forecasts size and interval separately.

D

Dead stock
Stock with no movement over a long, defined period, often a candidate for disposal.

D

Excess stock
Stock above what the current policy and expected demand require.
Expediting
Following up open orders with suppliers so they arrive on time.

D

Fill rate
The share of the requested quantity supplied from stock.

I

Intermittent demand
Demand with many periods of zero usage.

L

Lead time
The time from placing an order to having the part available to use.
Lumpy demand
Intermittent demand that also varies widely in quantity.

M

Material master
The ERP record that describes a material: description, units, classification and planning parameters.
MRO
Maintenance, repair and operations: materials used to keep assets and facilities running, rather than in the product itself.

O

Obsolete stock
Stock that is no longer needed, often because the equipment it supports has been removed.
Order-up-to level (OUL)
The stock level an order brings inventory back to.

P

Parts exchange (PEX)
Supplying a serviceable unit in exchange for a returned core.

Plant-critical spare
A part held for protection against a high-consequence failure, not for regular consumption.

R

Reorder point (ROP)
The stock level that triggers a replenishment order.
Rotable
A repairable component that cycles between service, repair and stock.

S

Safety stock
Buffer stock that covers variability in demand and lead time.
Service level
The probability of not running out of stock during a replenishment cycle.
Supersession
When one part number replaces another, for example after a design change.

T

TSB
Teunter-Syntetos-Babai, a forecasting method for intermittent demand that responds when items stop being used.

U

UNSPSC
United Nations Standard Products and Services Code, a global classification standard.

X

XYZ analysis
Classifying items by demand variability.

Talk to us