What is a plant-critical spare?
Protection, not consumption
Most stock is held because it will be used. A plant-critical spare is held because of what would happen if it were needed and not there. A large gearbox, a crusher main shaft or a specialised motor may sit on the shelf for years. That doesn’t make it excess; it protects the operation against a failure that would stop production for weeks.
This is why plant-critical spares cannot be planned like other stock. A forecast based on past usage will usually say “hold nothing”, because the part has rarely or never been used.
Questions to consider
How does the lead time compare with the outage the operation can accept?
Is there a substitute, a repair option or stock at another site?
How does the cost of a failure compare with the cost of holding the part?
Equipment criticality and material criticality
Equipment criticality describes how important a piece of equipment is to the operation. Material criticality describes how important a specific part is to that equipment. A filter on a critical pump may still be non-critical if it can be bought locally the same day. A bearing on a less important conveyor may be critical if it takes six months to arrive and there is no alternative.
Both views are needed. Linking spares to the equipment they support is what makes this possible.
Common mistakes
Forecasting critical spares
Treating every slow mover as obsolete
Making the decision once
Marking everything critical
Review critical spares regularly
A yearly review keeps the list honest. Check the installed base, retired or modified equipment, current lead times, alternative suppliers, repair options and the date of last use.
How StoXeo applies it
Frequently asked questions
Is a plant-critical spare the same as a slow mover?
Not always. Most plant-critical spares are slow movers, but many slow movers are not critical. The difference is the consequence of not having the part.
How many plant-critical spares should be held?
Often one, sometimes none if there is a reliable alternative such as stock at another site or a fast repair. The quantity follows from the risk assessment, not from a forecast.